Just had a thought.
I am going to be running 60 to 80 meters of hose at Tuena and you know the feeling,
Setup and start the pump.
Go to the highbanker, Need more water,
Back to the pump.
Go back to the Banker and find you have too much.
Back to the pump.
Go back to the Banker and adjust accordingly to suit.
Shovel like a demon for 1/2 an hour.
Back to the pump.
After shutting the pump down,
Go back to the Banker and clean it out.
Back to the pump.
Start it and back to the banker.
.
Soon fix that. :lol:
.
http://www.ebay.com.au/itm/1-x-OZ48...31c10fe&pid=100005&rk=1&rkt=6&sd=121487252401
I am going to be running 60 to 80 meters of hose at Tuena and you know the feeling,
Setup and start the pump.
Go to the highbanker, Need more water,
Back to the pump.
Go back to the Banker and find you have too much.
Back to the pump.
Go back to the Banker and adjust accordingly to suit.
Shovel like a demon for 1/2 an hour.
Back to the pump.
After shutting the pump down,
Go back to the Banker and clean it out.
Back to the pump.
Start it and back to the banker.
.
Soon fix that. :lol:
.
http://www.ebay.com.au/itm/1-x-OZ48...31c10fe&pid=100005&rk=1&rkt=6&sd=121487252401