Howdy all
It is with great excitement that I can confirm the minister for finance and leave has approved a small excursion away in a few months. With this I thought it may be a good idea to document (remind me) the process for some of you, this may be useful and for others you may laugh at my CDO
Seeing I usually have several projects on the go at once it is a good idea to have a checklist. This will be the basis along with a timeline so that key things are put were they need to be and general items can done as time allows. At the moment I will just mark as High (H) Medium (M) and Low (L) priority. I will assign dates to some once I have a better idea of the full requirements.
For ease I will also break it down into two main categories, being Prospecting/Research and Camping/4WD, and at this point they are fairly broad headings. I will try and include links that may be useful to the items or areas mentioned.
Prospecting/Research
Check dates on detectors for hire (H) (April 2015)
Get appropriate forms for access 40E (H) http://www.dmp.wa.gov.au/documents/132364_Section_40E_Permit_System.pdf
Confirm rough region of travel (M) (Murchison) http://www.dmp.wa.gov.au/14238.aspx
Look at Geo/Topo (M)
Old mines (M)
Additional research areas (L) Gold and gem magazine,
GPS points and key areas (L)
Camping/4WD -
Suspension Upgrade (H)
Under body protection Upgrade (H)
New Tyres (H)
Cargo Barrier (H)
Battery (M) Finish spread sheet on capacity needed
Charger (M) Decision -
Canopy (M)
Camera and Video (L-M)
Anderson Plugs for Solar Panels (M)
Water storage setup roof (L)
If anyone has any questions let me know, happy to assist were I can. Comments welcome always
Westaus
It is with great excitement that I can confirm the minister for finance and leave has approved a small excursion away in a few months. With this I thought it may be a good idea to document (remind me) the process for some of you, this may be useful and for others you may laugh at my CDO
Seeing I usually have several projects on the go at once it is a good idea to have a checklist. This will be the basis along with a timeline so that key things are put were they need to be and general items can done as time allows. At the moment I will just mark as High (H) Medium (M) and Low (L) priority. I will assign dates to some once I have a better idea of the full requirements.
For ease I will also break it down into two main categories, being Prospecting/Research and Camping/4WD, and at this point they are fairly broad headings. I will try and include links that may be useful to the items or areas mentioned.
Prospecting/Research
Check dates on detectors for hire (H) (April 2015)
Get appropriate forms for access 40E (H) http://www.dmp.wa.gov.au/documents/132364_Section_40E_Permit_System.pdf
Confirm rough region of travel (M) (Murchison) http://www.dmp.wa.gov.au/14238.aspx
Look at Geo/Topo (M)
Old mines (M)
Additional research areas (L) Gold and gem magazine,
GPS points and key areas (L)
Camping/4WD -
Suspension Upgrade (H)
Under body protection Upgrade (H)
New Tyres (H)
Cargo Barrier (H)
Battery (M) Finish spread sheet on capacity needed
Charger (M) Decision -
Canopy (M)
Camera and Video (L-M)
Anderson Plugs for Solar Panels (M)
Water storage setup roof (L)
If anyone has any questions let me know, happy to assist were I can. Comments welcome always
Westaus