Forums
New posts
Search forums
What's new
New posts
Latest activity
Members
Registered members
Current visitors
Charts
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Gold Prospecting
Do It Yourself (DIY) Projects
Building a large capacity High-banker - Instructional video
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Help Support Prospecting Australia:
This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Message
<blockquote data-quote="WalnLiz" data-source="post: 14951" data-attributes="member: 147"><p>Looking great Dave, The high mesh will tend to block but will still be OK for Sapphire areas. I would get some standard 1cm sloped expanded and cut them the same size as the Catwalk.</p><p></p><p>This way you can interchange them and use the "standard expanded" for gold only streams and the "Catwalk" for Sapphires. If the Catwalk blocks send me a PM and i'll get you some of the smaller size.</p><p></p><p>You also need to cut out more of those squares. Only leave a few squares along the edges for strength and make the whole of the inside section into rectangles.</p><p></p><p>Not so critical which direction they face. The small squares will fill with heavies, and not have enough water surface area to pull the gravel to the next chamber.</p><p></p><p>Cheers Wal.</p></blockquote><p></p>
[QUOTE="WalnLiz, post: 14951, member: 147"] Looking great Dave, The high mesh will tend to block but will still be OK for Sapphire areas. I would get some standard 1cm sloped expanded and cut them the same size as the Catwalk. This way you can interchange them and use the "standard expanded" for gold only streams and the "Catwalk" for Sapphires. If the Catwalk blocks send me a PM and i'll get you some of the smaller size. You also need to cut out more of those squares. Only leave a few squares along the edges for strength and make the whole of the inside section into rectangles. Not so critical which direction they face. The small squares will fill with heavies, and not have enough water surface area to pull the gravel to the next chamber. Cheers Wal. [/QUOTE]
Verification
Post reply
Gold Prospecting
Do It Yourself (DIY) Projects
Building a large capacity High-banker - Instructional video
Top